跳至主要内容 滚动顶部

CTDOT: Eastern CT Corridor Rail & Transit Feasibility Study

Click here to read more about the feasibility study and public outreach information.

Purpose of the Study
At the direction of the Connecticut Legislature, the Eastern CT Corridor Rail and Transit Feasibility Study will investigate the feasibility of and market for the following:

Extending the Shore Line East rail line to the State of Rhode Island
Establishing a new passenger rail service from the City of New London to the City of Norwich
Establishing a new passenger train station in the Town of Groton and the Borough of Stonington
Extending other ground transportation systems in the eastern region of the state and providing interconnection between such systems and rail lines
A feasibility study is the first step in evaluating the viability of service in a corridor. Depending on the findings, additional more detailed studies and designs may follow.

This feasibility study will consider:

Existing and future market and environmental conditions
Equity and environmental justice issues
Preliminary engineering
Ridership
Service operations
Equipment needs and system requirements
Preliminary costs and revenue forecasts.

Add Comment

More Recent Newsroom Posts
Clear Filters
New Route: Route 980
SEATWsmall2

服务警报

  • 1/10/26 New London Smart Ride will not start until 9:00am today due to driver call out, we apologize for any inconvenience this may cause

  • 1/8/26 由于结冰,第 6 次跑步将在上午 8:00 跳过 High St。我们将于上午 9:00 恢复比赛

  • 除夕更新 12/31:我们今天正常运营。今晚有可能下雪,可能会对服务造成影响,我们将发布任何变化。普雷斯顿行政办公室将于今天下午 2 点关闭。1 月 1 日,元旦:不提供服务。祝您新年快乐,万事如意!

随时了解 SEAT 服务变化,包括路线调整、时刻表更新和天气延误。关注我们的 Bluesky 账户,获取实时提醒。.
购物车
关闭
购物车
  • 购物车中没有产品。.
您的购物车目前是空的。.
请在结账前在购物车中添加一些产品。.
浏览我们的商店分类,了解新到商品和特价商品。.