주요 콘텐츠로 건너뛰기 위로 스크롤

CTDOT: Eastern CT Corridor Rail & Transit Feasibility Study

Click here to read more about the feasibility study and public outreach information.

Purpose of the Study
At the direction of the Connecticut Legislature, the Eastern CT Corridor Rail and Transit Feasibility Study will investigate the feasibility of and market for the following:

Extending the Shore Line East rail line to the State of Rhode Island
Establishing a new passenger rail service from the City of New London to the City of Norwich
Establishing a new passenger train station in the Town of Groton and the Borough of Stonington
Extending other ground transportation systems in the eastern region of the state and providing interconnection between such systems and rail lines
A feasibility study is the first step in evaluating the viability of service in a corridor. Depending on the findings, additional more detailed studies and designs may follow.

This feasibility study will consider:

Existing and future market and environmental conditions
Equity and environmental justice issues
Preliminary engineering
Ridership
Service operations
Equipment needs and system requirements
Preliminary costs and revenue forecasts.

Add Comment

More Recent Newsroom Posts
Clear Filters
New Route: Route 980
SEATWsmall2

서비스 알림

  • 1/10/26 New London Smart Ride will not start until 9:00am today due to driver call out, we apologize for any inconvenience this may cause

  • 1/8/26 런 6은 결빙으로 인해 오전 8시에 하이스트리트를 건너뛰고 진행됩니다. 오전 9시에 재개됩니다.

  • 새해 전야 업데이트 12/31: 오늘 정기 서비스를 실시합니다. 오늘 밤에 눈이 내릴 가능성이 있어 서비스에 영향을 미칠 수 있으며 변경 사항이 있으면 게시할 예정입니다. 프레스턴의 관리 사무실은 오늘 오후 2시에 문을 닫습니다. 1월 1일, 새해 첫날: 서비스가 제공되지 않습니다. 행복하고 안전한 새해 되세요!

노선 조정, 일정 업데이트, 날씨 지연 등 SEAT 서비스 변경 사항에 대한 최신 정보를 받아보세요. 블루스카이 계정을 팔로우하여 실시간 알림을 받으세요.
쇼핑 카트
닫기
장바구니
  • 장바구니에 상품이 없습니다.
고객님의 장바구니가 현재 비어있습니다.
결제를 진행하기 전에 장바구니에 일부 제품을 추가해 주세요.
쇼핑 카테고리를 둘러보고 신상품과 특별 혜택을 찾아보세요.